If you’re building a new home or planning an extension, you are likely to hear unfamiliar construction terms and first fix and second fix are among the most common.
First fix
The first fix relates to the mechanical and structural work which takes place before walls are plastered. It includes things like floor joists, door linings and internal stud walls. It also includes the work of electricians to run cables for switches, sockets and lighting and of plumbers to install pipes for water, waste and heating systems. When carrying out home renovations, the project manager should set out the timing for the first fix and plan it so the various trades can access the property at the right time. Anyone thinking of undertaking home renovations Fairford can use the expert services of companies like //precisionbuildersltd.co.uk/services/home-renovations/fairford to help plan.
The first fix is crucial for laying the foundations of any visible elements that are installed later and it is the time when any building inspections take place. While it may feel the project completion is a long way away, this phase is vitally important. If you have a contract with a builder, this should include timings for both fixes, with explanations about any delays.
Second fix
As soon as the plastering is done, the second fix can begin. This means finishing touches like light fittings, sockets and switches, as well as skirting boards and door hanging. Plumbers will return to connect toilets and sinks and this is when the flooring can go down.